Robin and I wrestle with the 2-man auger. I think her back muscles are still recovering. |
Two 3+ foot "bugs bunny" holes made by the auger. |
First of MANY trips to the hardware store. This precarious load included two 16 foot tall 4x4 posts. |
Brian spent the whole day with me getting the support posts and beams square, cemented, and bolted to one another. |
End of first real day of construction. Structure square and ready for decking. |
Installing decking. |
Trap door complete |
Robin helping me with the small suspended deck. |
ANOTHER trip to the hardware store. During one of these the cashier actually welcomed me by name. That can't be a good sign. |
Tres helping me frame out the walls on the ground. |
Once we lifted all walls onto the platform we discovered they fit together perfectly. He and I were both pretty surprised. |
Tres helping with wall boards as robin grinds the tips off of screw points which protruded through the trap door. |
Robin continuing to help with wall boards the next day. |
End of construction day four. Still not complete, but getting close! Considering a tin roof... |
Shutters & walls complete (still need a roof) |